Pages

Friday 27 December 2013


PROJECT 8: PERFORMANCE AWARDS & NIGHT RUS104 13/14

The theme for performance night is LOST KINGDOM..
Sweet and awesome night because that night we (planner) was born as knight of emperor Langkasuka...

For the performance, we divided into 2 group where girls present the traditional dance meanwhile boys perform a cup songs...Unfortunately, for the boys performance has  a technical problem  caused by neon lighting problem...huhuhu

but thats okay cos that actually be a great night for me..

preperation......


result.......

overall.....


PROJECT 7: EXIBITION DAY

This project been handled for one week with a theme of FLOATING LINES...
each major needed to decorate their own booth according to the theme and also represent their own sculpture, presentation drawing, model and report...

URBAN & REGIONAL PLANNING BOOTH





Thats all, thank you...


PROJECT 6: AMPHITHEATRE STAGE DESIGN 

& PROJECT REPORT


For this project, 7 different major has been combined in 12 different group with 16 members each group...
this project is quite challenging and the best project i ever done..huhu
Each group has given 8 weeks to settle this project starting with designing till physical model...

Site analysis: 
location is beside of HBP studio




Idea/design level
marine shell










 report level








construction level


 report a.k.a fb...lol

cutting process


main supporting structure


stage


roof 



painting


last touch up

lighting




little ads...haha ice cream time





Almost there n the result is........................



And that is complete views of our design...

thank you...
submission date :4 disember 2013

Thursday 26 December 2013


PROJECT 5: SITE ANALYSIS


5a - sense of place neighbourhood and community


for this task, i has decided to make Setia Green, Sungai Ara as our location for site analysis
a)existing condition

·         DILENNIA(29 UNITS)

·         ERETHIA(12 UNITS)

·         CASSIA(56 UNITS)

·         CORDIA(52 UNITS)

·         CITRUS1(15 UNITS)

·         CITRUS2(3 UNITS)



5b - proposed improvement


This area is still new and there is only about 10% population...concern about sustainability and safety of community...
b)proposed improvement

·   vegetation/landscape between road and playground(no gate to seperate this two areas)

·   ramp for OKU

·   mirror @ road junction- to reduce the risk of accident

·   way direction- easy for outsiders to find the house


project issued: 11 october 2013

submission date: 28 october 2013






PROJECT 4: PERSENTATION DRAWING


axonometric drawing


one point perspective drawing with human figure


This project require student to understand and improve the skill how to drawing in 2D and 3D form. For the first picture its about how to transfer data(model) in 3D form to 2D FORM in scale. This axonometric drawing depict about diferrent type of view such as plan, rear, left, right and top views of L shape chair..
For second picture, students require to draw in 3D form but no to scale.for the left side is axonometric drawing meanwhile the right side is one point perspective drawing with human figure..

thank you...


Project issued: 7 october 2013
submission date: 18 october 2013


PROJECT 3:


3a - SCULPTURE




This simple sculpture represent about modern design. Just like we know before, sculpture usually made from timber and rock. For modern design, wire and steel is used and it shows about design evolution. For my design, this sculpture present about a building(external)  and its core(internal). Its about how to built a strong building by using less natural source. let me ask you!!What its main component???Maybe you think its wire right??Did you notice that, the main component is AIR..its about how to reduce enviroment impact  while urban process is running...


3b - comfortable L shape chair





For this project, students required to make L-shape seating object that combines a table and chair. This project has been done in group about 3-4 members.
Ok now for our design,the concept is traditional mixed with a little bit of modern shape. Why its called like that?? Actually the design for L shape chair depict a traditional because main component of chair is timber(about 90%)  and rotten(10%)..The modern design that been mixed with that chair is adjustable table..
For unity concept, its a combination of modern and traditional design..
rotten(10%)..The modern design that been mixed with that chair is adjustable table..For unity concept, its a combination of modern and traditional design..


THANK YOU